1 |
B70 Monoblock Concrete Sleeper |
60E1 |
Monoblock |
873.251 |
TCDD (Production Between 2009 - 2018) |
2 |
B70 Monoblock Concrete Sleeper |
60E1 |
Monoblock |
708080 |
Ankara - Konya YHT Line / TCDD |
3 |
B70 Monoblock Concrete Sleeper |
60E1 |
Monoblock |
23000 |
Hasanbey Logistics Center / TCDD |
4 |
Sonneville Booted Block |
60E1 |
LVT Block |
90.500 |
Marmaray BC1 / TGN JV |
5 |
B70 Monoblock Concrete Sleeper |
60E1 |
Monoblock |
120.968 |
Renewal of Bozkurt - Dinar / TCDD |
6 |
B58 Monoblock Concrete Sleeper |
49E1 |
Monoblock |
238.000 |
Rehabilition and Signalization of IKZ Project / TCDD |
7 |
B58 Monoblock Concrete Sleeper |
54E1 |
Monoblock |
441.000 |
Awash - Weldia Railway Project Trackworks Construction |
8 |
B70 Monoblock Concrete Sleeper |
60E1 |
Monoblock |
40.000 |
ALSTOM Transport / Papua New Gine Mine Line |
9 |
B58 Monoblock Concrete Sleeper |
49E1 |
Monoblock |
31.000 |
Antalya Tramway / Antalya |
10 |
TW120 |
41GPU |
Bi Block |
46.989 |
Sétif Tramway / Algeria |
11 |
TW120 |
41GPU |
Bi Block |
40.434 |
Sidi Bel Abbes Tramway Line / Algeria |
12 |
YMPFB Block |
60Ri |
Block |
85.750 |
ESTRAM - Eskişehir Tramway Line |
13 |
B58 Monoblock Concrete Sleeper |
49E1 |
Monoblock |
199.576 |
Track Renewal Work on Irmak - Tuney - Kurşunlu / TCDD |
14 |
B07 Monoblock Concrete Sleeper |
60E2 |
Monoblock |
650.000 |
Yerköy - Sivas High Speed Line / TCDD |
15 |
Panelray Prefabricated Slab Track |
60E2 |
Slab Track |
21.000 |
Yerköy - Sivas High Speed Line / TCDD |
16 |
B07 Monoblock Concrete Sleeper |
60E2 |
Monoblock |
430.000 |
Kayaş - Yerköy High Speed Line / TCDD |
17 |
B70 Monoblock Concrete Sleeper |
60E2 |
Monoblock |
30.000 |
Kayaş - Yerköy High Speed Line / TCDD |
18 |
Panelray Prefabricated Slab Track |
60E2 |
Slab Track |
12.000 |
Kayaş - Yerköy High Speed Line / TCDD |
19 |
Bridge Sleeper |
54E1 |
Bridge |
17.500 |
Awash - Weldia Railway Project Trackworks Construction |